B-401550,B-401550.3 1 (2009-09-22)

handle is hein.gao/gaobadazq0001 and id is 1 raw text is: 




         G     A     0                                                 Comptroller General
       Accountability * Integrity * Reliability                         of the United States
United States Government Accountability Office      DOCUMENT FOR PUBLIC RELEASE
Washington, DC 20548                                  The decision issued on the date below was subject to a
                                                      GAO Protective Order. This redacted version has been
                                                      approved for public release.

          Decision

          Matter  of:  Anwar  Al-Anduols

          File:        B-401550; B-401550.3

          Date:        September 22, 2009

          Dorothy E. Terrell, Esq., Jonathan D. Shaffer, Esq., and Mary Pat Gregory, Esq.,
          Smith Pachter McWhorter, for the protester.
          Robert B. Neill, Esq., Department of the Army, for the agency.
          Mary G. Curcio, Esq., and John M. Melody, Esq., Office of the General Counsel, GAO,
          participated in the preparation of the decision.
          DIGEST

          Protest that agency improperly evaluated proposal as unacceptable is denied where
          record shows agency reasonably determined that materials list and conceptual
          layout required by solicitation were inadequate or incomplete.
          DECISION

          Anwar Al-Anduols of Iraq protests the Department of the Army's rejection of its
          proposal as unacceptable under request for proposals (RFP) No. W91GYO-09-R-0028,
          for the design and construction of buildings and facilities in Iraq.

          We deny the protest.

          The RFP  called for the design and construction of buildings and facilities, including
          an operations center, toilets and showers, a medical clinic, generator plants, a
          distribution center for electrical power, a water supply and distribution center, a
          reverse osmosis system, a water tank and pumping facility, and a facility for waste
          water treatment. RFP, Statement of Work. The RFP provided for award to the
          offeror that submitted the lowest priced, technically acceptable proposal. A
          technical proposal would be deemed acceptable where:

                The contractor submits a technical proposal containing a Design
                Package  which clearly demonstrates the proposed method of
                construction and includes details which demonstrates a logical
                solution for the method of construction being proposed and include
                the following: