                 COMPTROLLER GENERAL OF THE UNITED STATES
                          WASHINGTON. D.C. 20W8



  B-175633       Ci                          OCT 25i2

  Dear Senator Williams:

       Your letter of March 28, 1972, referred to us a letter
  from the Electrospace Cprporation, Long Island, New York,
] concerning the Army's method of retrofitting-AN/PRC-77 radio 22
  sets and of procuring additional sets. We advised you by
  letter dated May 17, 1972, that the procurement of additional
  sets had become the subject of a formal bid protest filed   4 /?
.-with our Office by Electrospace and that this aspect of your
  request would be dealt with in our decision on the protest.
  A copy of this decision will be provided to you when it is
  issued.

       With respect to retrofitting, Electrospace questioned
  whether the Army is wasting the taxpayers' money by doing
  the rework itself. Electrospace asserted that, because it
  made the radios, it was in a better position to perform the
  work required to correct the deficiencies involved.

  BACKGROUND

       The AN/PRC-77s are portable, short-range radios. The
  11,264 radios to be reworked were initial shipments made by
  Electrospace on an advertised, multiyear contract which calls
  for about 56,000 radios. Radios produced subsequent to the
  11,264 have been corrected in the manufacturing process.

       A problem with Electrospace-produced radios surfaced in
  early 1971 during testing by the Army Test and Evaluation
  Command at Fort Huachuca, Arizona. The Army concluded that
  this problem was traceable to inaccuracies in the radios'
  frequency synthesizer system. Electrospace claimed that the
  deficiencies were attributable to the design of the radios;
  this contention was countered somewhat by Army claims of
  poor workmanship and quality.

       Six engineering changes were developed which the Army
  believed would correct the deficiencies in the radios. The
  Army Electronics Command (ECOM) had not initially planned to
  obtain a cost estimate from Electrospace for necessary rework

                      ~~~7C o70 5