                   UNITED STATES GENERAL ACCOUNTING OFFICE
                           WASHINGTON, D.C. 20548


MMeON ANAI.YMU AN



B-206613                                             APRIL 19, 1982



The Honorable Carl M. Levin
United States Senate

Dear Senator Levin:                                            118198

       Subject: B-1B Bomber Program Baseline Costs
                 (MASAD-82-32)

       In accordance with your letter of April 12, 1982, and further
 discussions with Mr. Peter Lennon of your staff, we have examined
 whether (1) research and development costs for the Common Strategic
 Rotary Launcher (CSRL) should be included in the baseline cost es-
 timate for the B-lB program and (2) all the costs associated with
 fully equipping the B-lB to carry and launch air-launched cruise
 missiles were included in the baseline cost estimate.

 CSRL COSTS SHOULD NOT BE
 INCLUDED IN BASELINE ESTIMATES

      Since the CSRL is to be a common system planned to be used in
 the B-52H, B-lB, and eventually a new bomber, we do not believe
 that research and development costs for the CSRL should be
 included as an integral part of the baseline cost estimate for
 the B-lB bomber program. Such total costs should be shown as a
 related cost to the B-IB program in a clearly identifiable manner.
      The current B-lB estimate includes costs for a launcher which
 is unique to the B-lB. If the Department of Defense decides to use
 the CSRL for the B-1B, then the programed cost associated with the
 unique launcher currently in the baseline should be reconciled with
 the CSRL program.

 COSTS TO BE INCLUDED
 IN BASELINE ESTIMATES

      The costs associated with fully equipping the B-lB, including
 all components, avionics, hardware, and software, may be higher than
 what is included in the current baseline estimate. Although we have
 been unable to fully determine these additional costs and associated
 equipment, some additional costs would be incurred if a second
 inertial navigation system is added.

                                                      (951695)