CED-81-8 1 (1980-11-03)

handle is hein.gao/gaobabbew0001 and id is 1 raw text is: 


        ,'1Vf4                                             I (    ' o
                   UNITED STATES GENERAL ACCOUNTING OFFICE
                          WASHINGTON, D.C. 20548


COMMUNITY AND IcONOMIG
O9VCL0PMEKN DIVISION
                                                   NOVEMBER 3, 1980

      B-197746

      The Honorable David L. Boren
      United States Senate
                                                       113690
      Dear Senator Boren:

           Subject: [ederal Aviation Administration's
                     Management of Two Grants to the
                     Tulsa International Airport7
                     (CED-81-8)

           In a November 9, 1979, letter, you requested that we
      review how the Federal Aviation Administration (FAA) man-
      aged two grants for taxiway improvements at the Tulsa
      International Airport. Specifically, you asked us to
      determine if proper guidelines were followed and if suf-
      ficient guidelines have since been implemented to deter
      occurrences of this nature.

           The original grant in 1972 was for $2 million and was
      used to upgrade, with a concrete overlay, four main taxiways.
      Before the work was completed the overlay began to crack.
      The cracking posed a threat to flight safety, and in 1978
      the airport received a second grant which included $2.1 mil-
      lion to reconstruct and overlay. This work was completed
      in 1979. (See enc. I.)

           In December 1979, before we began-work, the city of
      Tulsa sued the consulting engineer who designed the first
      overlay. The suit alleges that the consulting engineer
      did not adequately design the overlay for the taxiways and
      did not fulfill all the terms of'his contract. The suit
      asks for over $5 million in damages.

           It is our policy not to offer opinions or decide matters
      where the material issues involved are before a court. Be-
      cause the grantee is suing its consulting engineer for pro-
      fessional negligence 5 years after the faulty work was
      detected, we focused our inquiry on two grant administration
      questions:

           --What role should FAA play in the grantee's
              selection of a consulting engineer?

                                  62/A 7~~-(341024)