                                         i nib

                 COMPTROLLER GENERAL F THEUNITEOSTATES *-
                            WASHINGTON, D.C. 20348


B-179140               RELEASED          a 7.m                   23 1974


The Honorable Charles H. Percy
United States Senate

Dear Senator Percy:

     By letter of April 1, 1974, you requested us to determine whether
the Coast Guard's planned sole-source procurement of a new line of air-
craft was justifiable or whether it should solicit competitive bids.
At an oral briefing in your office on May 15, 1974, we told your staff
of the results of our work and the status of this planned procurement.

     We explained that the Coast Guard was seeking a replacement for
its medium-range surveillance-type aircraft which was considered to be
obsolete and which was scheduled to be phased out by 1978. Because of
additional development costs and time needed to develop an aircraft
from specifications, the Coast Guard decided to procure an aircraft
currently in production. After studying its requirements and the char-
acteristics of available aircraft, the Coast Guard decided that the
Rockwell International Sabre 75A, suitably modified, was the only
available aircraft which would meet its requirements. Accordingly, the
Coast Guard planned to purchase, on a sole-source basfs, 41 Sabre 75A
aircraft during fiscal years 1975 through 1978.

     Although the Coast Guard's planned sole-source procurement ulti-
mately may have been justifiable, the Coast Guard could not document
its selection process. The files did not fully document the basis for
the Coast Guard's sole-source-procurement decision because they did not
show how the Coast Guard had established the requirements for all the
aircraft characteristics it considered in evaluating the suitability of
prospective aircraft nor did they show whether it had-established all
the requirements before it .selected the Sabre 75A, whether it had con-
sidered all potential suppliers equally, and whether it had applied all
major requirements equally to each aircraft it evaluated.

     On May 10, 1974, the Coast Guard announced that it had reassessed
its planned procurement of the Sabre 75A and that it would change to a
competitive two-step formal advertising method to obtain a suitable
aircraft from those currently in production. Under this procurement
method, the Coast Guard plans to solicit technical proposals from air-
craft manufacturers on the basis of operational and engineering require-
ments; evaluate the proposals as to acceptability; and solicit firm,