PSAD-77-13 1 (1976-12-15)

handle is hein.gao/gaobaaccv0001 and id is 1 raw text is: 


DOCUM~ENT RESUME


01775 - IAC5907101

Issues and Management Problems L. Developing an Improved
Air-Traffic-Control System. PSAD-77-13; B-164497(1). December
15, 1976. 37 pp. + 4 appendices.

Report to the Congress; by Elmer B. Staats, Cunptroller General.

Issue Ircsa: Science and Technology: hanagement and uversight of
    Programs (2004) ; Txansportation Systems and Policies:
    Management Practices in Transportation Programs (2405).
Contact: Procurement and Systems Acquisition Div.
Budget Function: Commerce and Transportation: Air Transportation
    (405).
organizatirn Concerned: Federal Aviation Administration.
Congressicinal Relevance: House Committee on Appropriations:
    Defense Subcommittee; House Committee on Public Vorks and
    Transportation; Senate Committee on Commerce; Congress.

         The FAAs engineering and development program
manageient was examined with an emphasis on the Upgraded Third
Generation System, a computer-based sesiautcmated system
intended for en route control centers and airport terminals.
FindiLqs/Conclusions: By the end of 1975, over $149 uillion had
been spent on the rUpgr0ed Third Generatijn System and $564
willion more was planned for the next decade. Detailed studies
and tzalyses which would provide information to assess the
program's potential have not been completed. Among the
unresolved issues are: whecher programs to develop the system
are designed in response to accident conditions and causes,
whether programs to develop the system 6;-p cost effective, and
whether the Government should go forward sith the T
Generation program. FAA's deveop5 men     -~l te     not
timely; they lack information needed for program appraisal; they
do not use savings techniques such as life-cycle-costing and
design-to-cost goals; and they do not adequately describe
integration of the various components into the existing system.
The Administration does not have effective management control
throughout development. Recommendations: A formai process to
formulate long-range requirements and incorporate criteria for
cost, schedule, and performance in these development plans
should be established. Systems analysis should be strengthened
and an implementation strategy should be developed early. (ERS)