Continuing Authorities Programs (CAPs) of the U.S. Army

Corps of Engineers


The U.S. Army  Corps of Engineers (USACE)   can study and
construct certain water resource projects of limited size,
cost, scope, and complexity without project-specific
congressional authorization. USACE performs  this work
under its programmatic authorities, known as continuing
authorities programs (CAPs). There are CAPs for various
purposes, as shown in Table 1. CAPs typically are referred
to by the section number of the law authorizing the CAP.
For most CAP  authorities, Congress has limited CAP
projects' federal cost (although at times it has authorized
project-specific exceptions). In some cases, Congress has
provided for certain CAP project costs to be undertaken at a


higher federal cost share (e.g., 33 U.S.C. §2310 for
territories and tribes, and 33 U.S.C. §2267b for post-
disaster watersheds). In addition, Congress authorized a
Community   Revitalization Program for USACE  to carry
out projects at 100% federal cost under various CAPs for
economically disadvantaged communities  (§165(a) of
WRDA 2020, as   amended,  33 U.S.C. §2281c); USACE
assigned the program supplemental funding in 2023,
solicited project proposals, and announced selection of 12
projects in 2024. The revitalization program's projects can
be pursued under various CAPs (§14, §103, §107, §204,
§205, §206, §208, and §1135).


Table  1. CAPs  Funded  by FY2024   Enacted Annual   Appropriations  (P.L. 1 18-42) in Millions of Dollars

                                                                                   Federal     Annual
                                                                  Nonfederal        Limit      Federal    FY2024
                                                                  Construction       per      Program     Annual
   CAP                      Project Types                         Cost Share       Project      Limit     Approp.
   §14     Emergency streambank erosion and shoreline         35%                    $15.00      $50.00      $5.00
           protection of public works and nonprofit services
           (33 U.S.C. §701 r)
   §103    Shore protection/beach erosion control             35%                    $15.00      $62.50      $0.50
           (33 U.S.C. §426g)
   §107    Navigation improvement (33 U.S.C. §577)            Variesa                $15.00      $62.50      $1.50

   §I I I  Mitigation (and prevention) of shore damage by federal  Same as the project   $15.00      No limit      $2.10
           navigation projects (33 U.S.C. §426i)              causing the damage                specified
   §204    Beneficial use of dredged material (33 U.S.C. §2326)b 35%b               $15.00b      $62.50     $18.00
   §205    Flood control projects, including ice jam prevention 35%-50% for          $15.00      $90.00     $12.00
           (33 U.S.C. §701 s)                                 structural;
                                                              35% for
                                                              nonstructural
   §206    Aquatic ecosystem restoration and drought resilience 35%, except 15% for  $15.00       $75.0      $8.00
           through wetlands restoration or invasive species   anadromous fish
           removal (33 U.S.C. §2330)                          projects
   §208    Removal of obstructions and clearing channels for flood 35%               $ 1.00c     $15.00      $0.25
           control (33 U.S.C. §701g)
   §1 135  Project modifications for improvement of the       25%                    $15.00      $62.00      $7.50
           environment and drought resiliency (33 U.S.C. §2309a)
Sources: CRS, based on statutes; U.S. Army Corps of Engineers, Planning: Continuing Authorities Program, Engineer Pamphlet 1105-2-58;
explanatory statement accompanying the Consolidated Appropriations Act, 2024 (P.L. 118-42), and Water Resources Development Act of
2024 (P.L. 1 18-272 , Division A; WRDA 2024).
Notes: CAP = continuing authorities program.
a.  Cost share varies based on depth: at the time of construction, 10% for improvements less than 20 ft. deep, 25% between 20 ft. and 55 ft.,
    and 50% for more than 55 ft, plus an additional 10% over a period not to exceed 30 years. Cost share is 50% for recreational navigation.
b.  Projects consist of regional sediment management to reduce storm damage, protect aquatic ecosystems, and improve environmental
    conditions (§204) and beneficial use of dredged material from federal water resource projects (§204(d)). Limit of 35% nonfederal cost
    share for costs beyond the base disposal plan costs (which is 100% federal cost of the least costly typical disposal), $15.0 million federal
    limit per construction activity, and $15.0 million per beneficial use/placement under §204(d). Multiple placements allowed under §204(d).
c.  $1,000,000 limit for any tributary in a fiscal year.