About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline



1 [1] (June 25, 2026)

handle is hein.crs/goveupw0001 and id is 1 raw text is: 




* Congressional Research Service
       Informing the Iegislatve debate since 1914


                                                                                              Updated June 25, 2026
Artemis: NASA's Program to Return Humans to the Moon


Artemis is the National Aeronautics and Space
Administration's (NASA's) program  to send American
astronauts to the Moon by 2028. This In Focus provides an
overview of the Artemis program, including its major
elements (Figure 1) and selected issues for Congress.

Figure  I. Major Elements  of the Artemis Missions,
Current  and Proposed


SpaceLaunch
  Sytm(SLS)z
NASA's rocket;
intended to launch
crew and cargo from
Earth


planned sp sation
operated by NASA and
foreign Partn spce
agencies; would operate in
lunar orbit


                 Human Landing
                 Systemn (HLS):
                 U& commercial pa   aft
                 intended to transport crew to
                 the Moons Surface under a
                 NASAconriact

          NASA Moon Base:
          proposed lunar outp a
NA Ascrewcapsule;
to be launched atop
an SLS rocket                     -


Source: CRS illustration based on information from NASA.
Notes: In March 2026, the NASA Administrator announced that the
agency intends to create a lunar outpost and pause development of
the Gateway. Both proposals are included in this figure.

Or2on and the Space Launch System
The Artemis program  has evolved from plans initiated in
the NASA  Authorization Act of 2010 (P.L. 111-267). The
act established a statutory goal of expand[ing] permanent
human  presence beyond low-Earth orbit and mandated the
development  ofa crew capsule and a heavy-lift rocket to
accomplish that goal. The capsule, now known as Orion,
and the rocket, known as the Space Launch System (SLS),
have been in development since that time (see Figure 1).
Each Orion capsule consists of a crew module with room
for four to six astronauts, storage space, and a docking port;
a service module (contributed by the European Space
Agency)  to provide power and propulsion; and a launch
abort system. The crew module is designed to be reusable
and is the only portion intended to return to Earth at the end
of a mission.
SLS  is an expendable rocket designed to carry Orion into
space and set it on an initial trajectory to the Moon. SLS
could also be used for other missions involving heavy
payloads or requiring very high thrust. As required by P.L.
111-267, SLS was  designed to accommodate future, phased
upgrades (known  as Block 1, Block 1B, and Block 2) to


increase its thrust capacity. Similarly, NASA planned to
upgrade SLS's upper stages (i.e., in-space propulsion) by
developing what is known as the Exploration Upper Stage.
The first launch of Orion on an SLS was in November
2022. This mission, known as Artemis I, was an uncrewed
test flight near the Moon to certify safety for crewed flights.
Artemis II, the first crewed test of Orion and SLS, occurred
in April 2026. Orion and its crew of four traveled near the
Moon  before returning to Earth.
In February 2026, the NASA  Administrator announced that,
after Artemis II, NASA will use a single version of SLS in
a near Block 1 configuration, rather than upgrading to the
Block  lB and Block 2 variants for future missions, in order
to reduce complexity and accelerate manufacturing. Rather
than developing the Exploration Upper Stage, NASA
selected the United Launch Alliance's (ULA'S) Vulcan
Centaur V Upper  Stage in March 2026. The agency intends
to award ULA  a sole-source contract (i.e., no competitive
bidding), as it determined that existing alternatives fail to
meet the performance requirements or would require
significant modifications or development.
Human Landing System
The Orion capsule is not designed to land on the Moon.
Instead, astronauts are to transfer to a separate spacecraft,
known  as a Human Landing  System (HLS), for lunar
descent and ascent (see Figure 1). NASA selected two HLS
providers: SpaceX, using a version of its Starship, and Blue
Origin, using its Blue Moon lander. Both systems are still in
development.
In February 2026, the NASA  Administrator announced that
the Artemis III mission, to occur in mid-2027, will
demonstrate one or both HLSs in low Earth orbit. Next,
Artemis IV is to be the first human landing on the Moon
since 1972 and is planned to occur by 2028.
In a March 2026 report, the NASA Office of Inspector
General (OIG) reported that both HLS providers have faced
schedule delays and technical challenges that have the
potential to further impact lander costs and delivery
schedules, particularly for a 2028 lunar landing. NASA is
considering proposals from both providers to accelerate
development  in support of the 2028 target date.
Other       ements
In addition to Orion, SLS, and HLS, NASA procures
commercial  space transportation services for small robotic
missions through its Commercial Lunar Payload Services
(CLPS)  program. The purpose of these missions is to
demonstrate new technologies, explore potential landing
sites, and conduct research in support of Artemis. Other
efforts include commercial procurement of spacesuits and
development  of lunar surface systems such as rovers.