Congres&on I Research Service
Informing the Iegishtive debate since 1914


                                                                                      Updated February 5, 2026

The Army's Self-Propelled Howitzer Modernization (SPH-M)

Program


ackground
The Army's current self-propelled artillery system, the
M-109  Paladin, first entered service in the 1960s and has
been upgraded numerous times. The Army has two types of
artillery: self-propelled, a howitzer mounted on a tracked or
wheeled vehicle, or towed, a howitzer towed by a vehicle
and then dismounted to fire. In 1994, the Army began to
develop the Crusader, an advanced self-propelled 155-
millimeter (mm) howitzer. The Crusader was canceled in
May  2002 when then-Secretary of Defense Donald
Rumsfeld stated that future enemy threats did not require
the Crusader and the Department of Defense wanted instead
to invest in other emergent technologies. The Army's
second attempt to develop a new self-propelled artillery
system, the Non-Line-of-Sight Cannon (NLOS-C), was to
be developed as part of the Army's Future Combat System
(FCS) program, which started in 1999 and was canceled in
2009 when then-Secretary of Defense Robert Gates
restructured the program and canceled its associated
vehicles. The third attempt for a new system was the
Extended Range Cannon  Artillery (ERCA) program (see
Figure 1).


Figure I. ERCA  Prototype


Source: U.S. Army, ERCA Autoloader is being tested tor first time
at YUMA Proving Ground, August 15, 2019.
The ERCA  program started in 2018 and reportedly was
intended to extend the range of artillery fire from 30
kilometers to 70 kilometers (43.5 miles). The ECRA
prototyping experience highlighted sustainment
considerations such as excessive gun-tube wear after firing
a relatively low number of rounds as a key performance risk
alongside maximum range. The Army discontinued the
ERCA  program in April 2024.


The   Army's Self-Propeled Howitzer
Modernization (SPHM) Effort
The SPH-M  effort was previously known as the Next
Generation Howitzer (NGH) Program. The SPH-M  Effort
replaced the ERCA program and is the fourth attempt to
develop a new self-propelled howitzer to support the
Army's Armored  Brigade Combat Teams (ABCTs), which
comprise M-1 Abrams tanks and M-2 Bradley infantry
fighting vehicles (IFVs). In the aftermath of the ERCA
cancellation, the Army initiated a new conventional fires
study in 2023 to determine the way ahead for artillery
modernization. The study was completed in March 2024
and reportedly determined the service should focus on
more autonomous artillery systems with greater range and
improved mobility.

SPH-M Requirements
According to Army FY2025 budget documents
    The Next-Generation Howitzer (NGH) will provide
    highly mobile, survivable, versatile, transportable,
    longer range fire support under a broad set of
    challenging operational conditions against current
    and emerging, small to large scale threats through
    2040 and beyond. NGH  reduces emplacement and
    displacement  times, provides increased  crew
    survivability and better cross-country mobility,
    adds overall effectiveness, and affords improved
    fire support capability for field artillery formations
    well beyond  what towed  howitzer systems can
    provide.

SPH-M Program Activties
The Army  reportedly conducted a number of successful
tests with the ERCA before cancelling the program; those
past testing activities are to inform the SPH-M program.
For example, in 2022, ERCA hit a target at 70 kilometers
(43 miles) with an M-982 Excalibur extended-range guided
artillery shell.
On August 28, 2024, the Army issued a request for
information (RFI) to industry to
    identify and preliminarily review the maturity of
    potentially offered self-propelled howitzer systems.
    The  U.S. Government   (USG)  is interested in
    systems that have high maturity and minimize or
    eliminate development time. Additionally, the USG
    is interested in understanding the possible future
    modernization options for those systems. Any
    information received in response to this survey will
    be used by  the USG  to assess the viability of
    potential future acquisition strategies. When