About | HeinOnline Law Journal Library | HeinOnline Law Journal Library | HeinOnline



1 [1] (June 17, 2025)

handle is hein.crs/cornrke0001 and id is 1 raw text is: 





Congressional Research Service
Inforrning the legislative debate since 1914


S


June 17, 2025


Offshore Wind: Status and Issues for the 119th Congress


The Outer Continental Shelf Lands Act, as amended
(OCSLA;  43 U.S.C. 1337(p)), authorizes the Secretary of
the Interior to lease submerged lands on the U.S. outer
continental shelf (OCS) for development of renewable
energy, including wind energy. The Department of the
Interior's (DOI's) Bureau of Ocean Energy Management
(BOEM)   carries out this responsibility. BOEM has awarded
dozens of leases for offshore wind development, primarily
in the Atlantic region and also off California (five leases)
and in the Gulf of America (one lease). Two wind farms are
operating on the federally managed OCS off the coasts of
Massachusetts and Rhode Island (in addition to a project in
Rhode  Island state waters), and several more projects are
under construction.

The U.S. offshore wind industry has faced economic and
supply-chain challenges in recent years that have led to the
postponement or cancellation of some projects. Projects
also have faced legal challenges from coastal homeowners
and preservationists, the fishing industry, tribes, and those
concerned about potential impacts to marine wildlife.
Presidents Biden and Trump have differed in their
approaches to offshore wind. President Biden promoted a
goal to deploy 30 gigawatts of offshore wind capacity by
2030. President Trump has halted offshore wind leasing and
permitting on the OCS in light of concerns about the
adequacy of previous federal reviews of these activities.
The 119th Congress is considering offshore wind leasing,
permitting, transmission, tax credits, and related matters
through oversight and legislation.

Offshore Wind Leasing
On January 20, 2025, President Trump issued a
memorandum   on offshore wind, which used presidential
authority under Section 12(a) of OCSLA (43 U.S.C.
§1341(a)) to temporarily withdraw the entire OCS from
availability for any new or renewed wind energy leasing.
The withdrawal means that potential offshore wind lease
sales announced by the Biden Administration would not
take place, including a sale for the Central Atlantic area and
potential further sales in the Atlantic, Pacific, and Gulf of
America regions and offshore of U.S. territories.

The memorandum   states that further wind leasing on the
OCS  is prohibited until this Presidential Memorandum is
revoked. Because OCSLA   Section 12(a) does not
explicitly provide revocation authority, there is legal
uncertainty about whether a President can revoke a Section
12(a) withdrawal, and courts may address this matter.
Congress could consider whether to clarify presidential
authority in this respect; some 119th Congress bills (e.g.,
H.R. 513) would modify the Section 12(a) withdrawal
authority. Concerning offshore wind leasing specifically,
H.R. 1781 and S. 837 would provide that the President's


memorandum   shall have no force or effect, and no federal
funds may be used to implement it. If the withdrawal were
nullified in this manner by law, DOI could consider
whether to proceed with additional OCS wind leasing under
its leasing regulations at 30 C.F.R. Part 585, Subpart C, and
statutory requirements such as those in Section 50265 of
P.L. 117-169 (commonly known  as the Inflation Reduction
Act, or IRA), which condition BOEM's wind leasing
authority on specified leasing activities for OCS oil and gas.
Alternatively, Congress could legislate directly on offshore
wind lease sales, either to require or prohibit sales. For
instance, H.R. 674 in the 119th Congress would prohibit
wind leasing in parts of the Gulf of Maine.

Permitting Activities on Existing Leases
President Trump's memorandum  also directed the Secretary
of the Interior and other relevant Secretaries and agency
heads to temporarily halt certain permitting and approval
activities for offshore (and onshore) wind projects, pending
a comprehensive assessment and review of Federal wind
leasing and permitting practices. The temporary halt
applies to issuance of new or renewed approvals, rights of
way, permits, leases, and loans for wind projects.

BOEM   administers approximately 40 active offshore wind
leases, many of which are affected by the temporary halt on
offshore wind permitting and approvals. Most lessees have
not yet received the necessary permits and approvals for
project construction. After a lease is awarded, developers
submit construction and operations plans (COPs) to BOEM
for approval and apply for necessary permits from other
agencies, such as the National Oceanic and Atmospheric
Administration (NOAA)  and the U.S. Army Corps of
Engineers. Agencies must evaluate project proposals in
compliance with the National Environmental Policy Act
(NEPA;  42 U.S.C. §§4321 et seq.). BOEM typically leads
the preparation of an environmental impact statement (EIS)
and record of decision, which other agencies may sign onto,
to inform conditions for approving COPs and issuing
permits. The President's memorandum halts these activities
pending a comprehensive review of federal wind leasing
and permitting practices. Accordingly, BOEM has canceled
or postponed activities related to EISs for pending offshore
wind projects (e.g., in the Atlantic and Pacific regions).
Separately, DOI's FY2026 budget request seeks the
elimination of funding for BOEM's renewable energy
program, which would remove  agency capacity for project
review and permitting.

For 11 active commercial-scale projects, all in the Atlantic
region, the approvals and permits to authorize construction
and operations already had been issued prior to the
President's memorandum. These projects are at various
stages of completion. The 12-turbine South Fork Wind


https://crsreports.congress.gov